DMPQ- Explain the Hydraulic filling method of Soil Reclamation.

The hydraulic filling method is suitable for granular fill. Generally, this method is used when filling is carried out from an offshore source, either from a rehandling pit, as explained earlier, or from a trailer suction hopper dredger. In the case of pumping from a cutter suction hopper dredger, the fill material is dredged from the borrow source with its own trailer suction dredger which is moved adjacent to the reclamation area and then pumped through the discharge pipe. Bulldozers are used to grade and spread the fill material around the discharge pipe. The discharge pipe is usually set slightly above the required finished level. Pumping is usually done with a mixture of fill material and water. The ratio of fill material to water is adjusted according to the grain size of the fill material. A large ratio of material to water would lead to wearing of the inner walls of the sand transportation pipe. On the other hand, a smaller ratio of material to water will reduce the production rate. After a certain amount of land has formed, the pipes are extended accordingly. Usually, the diameter of the sand transportation pipes is about 800 – 1000 m and 10 meters in length. Normally, wearing occurs at the bottom of the pipe, therefore, frequent rotation of the pipe after usage is necessary. Pipes that have to run above water can be floated with floaters attached to the pipes.

Our APPSC Notes Courses

PDF Notes for Prelims Exam

Printed Notes for Prelims Exam

Mock Test Series for Prelims Exam

PDF Notes for Mains Exam

Printed Notes for Mains Exam

Mock Test Series for Mains Exam

Daily Mains Answer Writing Program

JKPSC Mains Exam

JKPSC Prelims Exam

Admit Card

Syllabus & Exam Pattern

Previous Year Papers

Eligibility Criteria

Results

Answer Key

Cut Off

Recommended Books

Exam Analysis

Posts under APPSC

Score Card

Apply Online

Selection Process

Exam Dates

Exam Highlights

Notifications

Vacancies

Exam Pattern

Prelims Syllabus

Mains Syllabus

Study Notes

Application Form

Expected Cut-Off

Salary & Benefits

Mock Tests

Preparation Tips

Study Plan

Jammu & Kashmir Administrative Service (JKAS)

Jammu & Kashmir Police Service (JKPS)

Jammu & Kashmir Accounts Service (JKAS - Accounts)

Jammu & Kashmir Civil Service (Judicial)

Medical Officer (Allopathy)

Veterinary Assistant Surgeon

Assistant Engineer (Civil)

Assistant Engineer (Mechanical)

Assistant Engineer (Electrical)

Assistant Conservator of Forest (ACF)

Range Officer (Wildlife)

Range Officer (Territorial)

Range Officer (Soil Conservation)

Assistant Director (Statistics)

Statistical Officer

Assistant Professor (Various Subjects)

Lecturer (School Education)

Assistant Engineer (Accounts)

Executive Engineer (Accounts)

Excise and Taxation Officer

Excise and Taxation Inspector

Excise and Taxation Sub-Inspector

Revenue Service (Executive)

KAS Probationers

Subordinate Accounts Course (SAC-I)

Subordinate Accounts Course (SAC-II)

Accounts Clerk Course (ACC)

IAS Probationers

Labour Inspector/Officer

Junior Statistical Assistant Course

Statistical Assistant Course

error: Content is protected !!